REFERENCES Design drawings: IEX0402D-revA01 Using cross-section model in bottom lefhand corner of drawing. Sequence begins at anode of ion source as told by Mel Good. Starting coordinates on IEX0402D: x = 9.886" y = 12.495" -meagan though this looks like an einzel lens, Mel has informed me it is grounded and is just a set of apertures. I have placed it in the xml file in the einzel lens format with the correct length and s value just in case. The fit statements above are a 10mm aperture at the edge of this "orifice" -meagan Sequence ends at end of aperture before ILE cross section (IEX0405) because Mel has given me the distance between this aperture and the next einzel lens above the cross assembly. Coordinates on IEX0402D: x = 9.886" y = 17.758" total distance from TIS anode: 133.680mm The following bit of commented out code was measured from an incorrect drawing, but I kept it included for history purposes. -meagan REFERENCES Design drawings: IEX0402D-revA01 IEX0403D-revA Using cross-section model in lower middle of drawing. Sequence begins at aperture on previous drawing, as the distance between said aperture and an aperture before the einzel lens has been provided by Mel Good. Starting coordinates on IEX0402D: x = 9.886" y = 17.758" Coordinates of aperture (drawing reference for distance given): x = 31.648" y = 6.241" -meagan distance between TIS1 section and deflector (as there is no drawing with both included) was given by Mel Good. sequence ends at end of deflector ILE2T:YCB3 on ISK4369: x = 0.02888" y = 27.92116" Coordinates of end of TIS1 section before going through straight bender on IEX0403: x = 31.648" y = 15.988" total distance from TIS anode: 1170.406mm -meagan REFERENCES Design drawings: ISK4369D-revG sequence begins at end of deflector ILE2T:YCB3 x = 0.02888" y = 27.92116" -meagan Olivier: 7 June 2019 corrected typos, Meagan's references remain in effect. Quad lengths changed from eletrical length to effective. See: http://lin12.triumf.ca/Optics/Quadrupoles/FFintegrals/ISISACsummary.txt sequence ends at end of quad ILE2T:Q3 x = -0.01242" y = 37.53216" -meagan sequence end moved forward from above values by 5.46*mm to allow increased length of Q3 (effective vs electrical). trfc_db1 also moved forward by the same amount. REFERENCES Design drawings: ISK4369D-revG sequence begins at end of quad ILE2T:Q3 x = -0.01242" y = 37.53216" -meagan Sequence moved forward by spencer by 5.46*mm to end at ILE2:Q3 effective end rather than electrical end. All device positions in this sequence adjusted accordingly. copied and pasted epics information from another IV, unsure if the same for this IV or if these values are in epics -meagan beginning of faraday cage/rfq -meagan decel element type, optr tag, and length taken from rick's decel-to-rfq transoptr file, with s value measured from ISK4369D -meagan sequence ends on skimmer TRFC:SK3B after decelerator x = -0.01242" y = 64.81948" total distance from TIS anode: 3473.421mm -meagan